  1. Date: Tue, 15 Dec 92 05:00:04    
  2. From: Space Digest maintainer <digests@isu.isunet.edu>
  3. Reply-To: Space-request@isu.isunet.edu
  4. Subject: Space Digest V15 #546
  5. To: Space Digest Readers
  6. Precedence: bulk
  7.  
  8.  
  9. Space Digest                Tue, 15 Dec 92       Volume 15 : Issue 546
  10.  
  11. Today's Topics:
  12.                    absolutely, positively overnight
  13.                  DC vs Shuttle capabilities (2 msgs)
  14.                            DoD launcher use
  15.                          fast-track failures
  16.                        Mach 8+ Space/Spy Plane?
  17.                              Sea Dragon?
  18.                             Space Tourism
  19.                              SSF Progress
  20.        SSF Progress 1 of 2 (Was: One small step Space Activist)
  21.            Terminal Velocity of DCX? (was Re: Shuttle ...)
  22.                                Titan IV
  23.                        Titan IV Costs (2 msgs)
  24.                            What is a VSAT?
  25.                what the little bird told Henry (2 msgs)
  26.  
  27.     Welcome to the Space Digest!!  Please send your messages to
  28.     "space@isu.isunet.edu", and (un)subscription requests of the form
  29.     "Subscribe Space <your name>" to one of these addresses: listserv@uga
  30.     (BITNET), rice::boyle (SPAN/NSInet), utadnx::utspan::rice::boyle
  31.     (THENET), or space-REQUEST@isu.isunet.edu (Internet).
  32. ----------------------------------------------------------------------
  33.  
  34. Date: 14 Dec 92 17:22:52 GMT
  35. From: "Edward V. Wright" <ewright@convex.com>
  36. Subject: absolutely, positively overnight
  37. Newsgroups: sci.space
  38.  
  39. In <Bz4841.Ar8@zoo.toronto.edu> henry@zoo.toronto.edu (Henry Spencer) writes:
  40.  
  41. >I don't seriously expect that a DC-1 would ever become Air Force One,
  42. >actually.  Not because it's dangerous, but because it's too *small*,
  43. >and because servicing facilities for it won't be nearly as common as
  44. >those for 747s for a long time.  But I rather suspect it would be rather
  45. >less than twenty years before the president rides in one.  He *is* the
  46. >boss, after all...
  47.  
  48. "Air Force One" is just a call sign for whatever plane the President
  49. happens to be riding in.  The Air Force has an entire squadron of planes 
  50. which, at one time or another, may be Air Force One.  The big 707 (now 
  51. 747) is the most famous, but not every trip requires something that
  52. large.
  53.  
  54. A DC-type vehicle would probably find use because it would allow
  55. certain types of diplomatic missions that are impossible today.
  56. Remember shuttle diplomacy?  If the President, or one of his
  57. advisors, can fly halfway across the globe, attend a top-level
  58. meeting, and return to Washington, all in one afternoon, I think
  59. that's a capability that would be used.  If nothing else, it would
  60. allow short-notice meetings to be held before the press figured out
  61. what was going on.
  62.   
  63.  
  64. ------------------------------
  65.  
  66. Date: 14 Dec 92 17:33:48 GMT
  67. From: "Edward V. Wright" <ewright@convex.com>
  68. Subject: DC vs Shuttle capabilities
  69. Newsgroups: sci.space
  70.  
  71. In <3kf2v=-@rpi.edu> kentm@aix.rpi.edu (Michael V. Kent) writes:
  72.  
  73. >Delta Clipper's projected 2-day on-orbit time is too short for Spacehab
  74. >work, especially if you have a space station.  
  75.  
  76. The two-day endurance is based on consumables.  You could extend it
  77. considerably by carrying extra consumables in lieu of some cargo (or
  78. docking with a second DC acting in a consumables-tanker role). 
  79.  
  80. ------------------------------
  81.  
  82. Date: 14 Dec 92 17:59:34 GMT
  83. From: "Allen W. Sherzer" <aws@iti.org>
  84. Subject: DC vs Shuttle capabilities
  85. Newsgroups: sci.space
  86.  
  87. In article <g9g2v_p@rpi.edu> strider@clotho.acm.rpi.edu (Greg Moore) writes:
  88.  
  89. >    You missed my point.  If your crew compartment is in the cargo
  90. >bay, where do you put the satellite?
  91.  
  92. First of all, which crew? The flight crew rides in the cockpit which is
  93. above the cargo bay. If more crew are needed, then the satellite can
  94. ride in the part of the cargo bay not used by the extra crew.
  95.  
  96. If it turns out that this isn't roomy enough, then you use the technology
  97. developed under DC to build a larger vehicle. After all, DC will be a usefull
  98. piece of technology but it isn't the only spaceship which will ever be built.
  99.  
  100. >    I eliminated some stuff above, but wanted to add some stuff here.
  101. >Actually, plummeting launch costs may contribute to lower payload costs
  102. >since people will be willing to build a less fault tolerant system
  103. >knowing that if it fails, they can launch another cheaply.  
  104.  
  105. Exactly.
  106.  
  107. >As for on-site repair, for now DC-? fails for the same reason that
  108. >the Shuttle normally does, it can't get up to GEO, you need a  OTV... 
  109.  
  110. Although a DC with a robot arm and some avionics changes may be the
  111. OTV. Certainly the engines for a DC will be just what an OTV needs.
  112.  
  113. >>>    Also, as for retrieval, the Shuttle has shown that it ain't
  114. >>>easy to do.  Will a two day on-orbit time be enough?
  115.  
  116. >>It may take modifications to the DC. At the very least you need to add
  117. >>a robot arm and an airlock.
  118.  
  119. >    Granted, but that's not what I meant.  Will you have enough time
  120. >to rendevous and capture the satelite?  It took what 3 days for the
  121. >shuttle to capture Intelsat VI? That's aday more than DC-?.
  122.  
  123. Load the pallet with some extra power sources, add some solar cells and
  124. your all set.
  125.  
  126. >Also, what type of fuel margin would DC-1 have for IN-orbit
  127. >manevours? 
  128.  
  129. DC-Y has a fair amount of fuel for on orbit delta V but I don't
  130. remember the exact numbers. How much DC has will depend on the
  131. design requirements and who pays the bills.
  132.  
  133. But note that on a DC-Y you can power the fuel cells, main engines, and
  134. RCS from the same source. This allows you some very powerful tradeoffs.
  135.  
  136. >(I realize it has enough for landing, and of course
  137. >you don't wnt to cut into that for safety reasons.)
  138.  
  139. At least enough to get back to the orbital fuel dump.
  140.  
  141. >    Use it yes, but use it for what it can be used for economically.
  142. >Let's see, we've added an airlock, an arm, additional on-orbit capacity.
  143. >Hmm, that adds up, and add complexity.  Yes, let's ok at possibilities,
  144. >but not claim t they are definites.
  145.  
  146. Agreed. But they don't look all that hard given a working DC.
  147.  
  148. >>My view is that we use the basic DC as a 'bus' which can be modified in
  149. >>small ways to meet diverse missions. Costs are cut because the same assembly
  150. >>lines are used to make DC1-EOT (Earth orbit transfer), DC1-OMV, and DC1-LM.
  151.  
  152. >    I have a question about this.  EOT and LM should require roughly
  153. >the same amount of fuel, no? 
  154.  
  155. Pretty much.
  156.  
  157. >But how economical is it to transport that fuel TO orbit?  Am I correct in 
  158. >remembering you saying about 10 DC-1 flights?
  159.  
  160. Yes it would take roughly 10 DC flights to carry up the fuel. Soon however
  161. the availability of lunar oxygen and perhaps hydrogen will greatly reduce
  162. that cost.
  163.  
  164. The bottom line however is that it is still a lot cheaper than the current
  165. plans.
  166.  
  167. >    Also, does it make sense for the DC1-EOT and OMV and LM the same.
  168.  
  169. Not 100% the same. For an OMV I would strip off the thermal protection
  170. system, add attach points outside for additional fuel and hardware (like
  171. arms), I might look at lining it with solar cells for more power. For a LM
  172. I think you would need to provide better insulation to reduce fuel boil off,
  173. replace the landing gear to give it a larger footprint (like the Apollo LM),
  174. and beef up the TPS for aerobreaking.
  175.  
  176. This will allow us to use the same core vehicle for multiple applications
  177. which will allow development to be amortized over more vehicles and reduce
  178. construction costs since we are building more core vehicles.
  179.  
  180.       Allen
  181.  
  182. -- 
  183. +---------------------------------------------------------------------------+
  184. | Allen W. Sherzer | "A great man is one who does nothing but leaves        |
  185. |  aws@iti.org     |  nothing undone"                                       |
  186. +----------------------131 DAYS TO FIRST FLIGHT OF DCX----------------------+
  187.  
  188. ------------------------------
  189.  
  190. Date: 14 Dec 92 14:41:35 GMT
  191. From: Gary Coffman <ke4zv!gary>
  192. Subject: DoD launcher use
  193. Newsgroups: sci.space
  194.  
  195. In article <1992Dec13.212814.14887@iti.org> aws@iti.org (Allen W. Sherzer) writes:
  196. >In article <1992Dec13.183545.9958@ke4zv.uucp> gary@ke4zv.UUCP (Gary Coffman) writes:
  197. >>We're talking about Iraq right? No air opposition right? Complete Coalition
  198. >>domination of the airspace right? 
  199. >
  200. >I would hate to base all US defense donctrine on the assumption that ALL air
  201. >wars will be just like Iraq. BTW, despite our domination of the air, coalition
  202. >aircraft WHERE shot down.
  203.  
  204. I agree that not all conflicts will be as easy as the Gulf War and that
  205. satellite recon is very valuable, especially for strategic recon. But the
  206. origninal message that I questioned said that the Space Command commander
  207. during *Desert Storm* said he needed tactical satellite recon *for that
  208. conflict*. And yes, A10s and Tornados doing low level attacks were lost
  209. to ground fire in Desert Storm as well as a few other operational type
  210. aircraft like an AC130, but as far as I know, no recon aircraft were lost.
  211.  
  212. >For many applications satellites are more productive. They provide faster
  213. >responce and allow scarse aricraft to be better utilized.
  214.  
  215. see below
  216.  
  217. >>What can a satellite do for tactical recon that a SR71 can't?
  218. >
  219. >Updates of the tactical situation with SR-71 would take about 6 to 8 hours
  220. >to get and would be several hours old by the time they get to the local
  221. >commanders. Satellite images take seconds to get and are fresh. In the Gulf
  222. >war, images just a few hours old would have been useless.
  223.  
  224. But this was exactly my point. LEO satellites pass over the same ground
  225. track twice a day. So if you need pictures of a given battlefield, you
  226. wait for the satellite to pass over the spot, up to 24 hours if you need
  227. a daylight picture, up to 12 hours if you'll take any picture. Then, unless
  228. you have realtime downlink in the footprint of the satellite, very close
  229. to your target, you wait for the satellite to pass over your downlink station
  230. and download the image. This can take up to another 12 hours. You can
  231. launch ramp ready recon aircraft in 10 minutes if necessary, though 
  232. normally you'd schedule recon as part of an operational timetable.
  233. You can get back immediate Mark I eyeball reports during the mission
  234. and photos as soon as the aircraft returns.
  235.  
  236. To return tactical target data, like a damage report on a bridge, you
  237. need fairly high resolution. With a satellite, that's KH-11 or KH-12
  238. class optics. That's still too expensive to toss up on whim for a one
  239. shot look. Aircraft with mounted optics of much less precision and cost,
  240. due to the lower altitude, can get a picture and come back to base to
  241. be used again and again. Now if the threat level over the target is
  242. *really* high so that not even a SR71 or F117 has a chance of survival, 
  243. and the information is vital, then you could expend a KH-12 class satellite
  244. to gather it. Seems that if DC-1 works, you'd just use *it* so you could
  245. get your expensive optics back instead of expending a satellite.
  246.  
  247. I know there's lots of interest in lightsats and microsats for intelligence
  248. gathering, but to date none have flown with the level of optics needed
  249. for damage assessment on a tactical level. I'm guessing they *can't* because
  250. the optical platform has to be too large. But that kind of information
  251. is classified so I can't say that for sure. A GEO satellite with superb
  252. optics might be able to give you realtime data, but that's not a DC-1
  253. payload. That's at least a Titan IV payload and a large ground support
  254. center to operate the satellite and process the data. It's certainly
  255. not something you throw up on whim for tactical data gathering, it's
  256. a major national resource costing at least as much as Hubble. Even if
  257. the launch were free, it would still be very expensive.
  258.  
  259. Gary
  260.  
  261. ------------------------------
  262.  
  263. Date: 14 Dec 92 14:53:51 GMT
  264. From: Gary Coffman <ke4zv!gary>
  265. Subject: fast-track failures
  266. Newsgroups: sci.space
  267.  
  268. In article <Bz7wLM.6s8@zoo.toronto.edu> henry@zoo.toronto.edu (Henry Spencer) writes:
  269. >
  270. >Just which aircraft were you thinking of, Gary?  I can think of one
  271. >aircraft that had a bad performance shortfall but was redesigned and
  272. >continued into a successful program (the F-102).  I can't think of
  273. >*any* F-series "gap" in the last 40 years that fits your description.
  274.  
  275. Yeah, bad line of argument, most of the systems that made it as far
  276. as being assigned a number weren't technical failures even if they
  277. were market failures. Actually I was thinking of the P-39 when I
  278. wrote that. That aircraft made it into production, but was a dismal
  279. failure at meeting it's procurement goals. It started out as a 5,000
  280. pound turbosupercharged high performance all altitude fighter and
  281. was sold to the Air Corps as such. But by the time it was delivered,
  282. it was 50% overweight, had the turbosupercharger deleted, had poor
  283. rate of climb, and a low service ceiling. This was an example of
  284. fast tracking from a prototype to production without working out
  285. all the bugs required to make it a practical fighter.
  286.  
  287. Gary
  288.  
  289. ------------------------------
  290.  
  291. Date: 14 Dec 92 15:58:06 GMT
  292. From: Kenneth D Rolt <kdrolt@athena.mit.edu>
  293. Subject: Mach 8+ Space/Spy Plane?
  294. Newsgroups: sci.aeronautics,sci.space
  295.  
  296. Rich Silva [rich@locus.com] wrote:
  297. >I was in Joshua Tree national forest last May when I saw a plane in the upper
  298. >atmosphere fly across the sky about as fast as metors do I didn't here any
  299. >sonic booms but I't couldn't have been a jet airliner it was moving too fast
  300. >I did notice it's contrail was lumpy like -+-+-+-+-+-+ like a pulse.
  301.  
  302. a possible reason why you didn't hear anything {i.e. no sonic boom, and no
  303. thrust noise} was that the sound from the mach cone and from the jet was
  304. refracted too much away from the ground due to a sound speed profile in the
  305. atmosphere:  the sound speed for the *aircraft* altitude was slower than the
  306. speed of sound on the ground, so the sound waves refracted enough for you to
  307. be in an acoustical shadow zone.  the same phenomenon exists in the ocean.  of
  308. course, maybe you really didn't see anything at all   :)     -ken
  309.      -----------------------------------------------------------------
  310.     |    R  2          Real Monza         kdrolt@athena.mit.edu    |
  311.     |    |__|                    grad student !!       |
  312.     |    |  |    '64 Corvair Convertible      mit ocean engineering    |
  313.     |    1  3                    underwater sound      |
  314.      -----------------------------------------------------------------
  315.  
  316. ------------------------------
  317.  
  318. Date: 14 Dec 92 16:18:11 GMT
  319. From: Thomas Clarke <clarke@acme.ucf.edu>
  320. Subject: Sea Dragon?
  321. Newsgroups: sci.space
  322.  
  323. I see many references to Bob Truax's Sea Dragon design.
  324.  
  325. Can anyone point me at a reference, or post a summary
  326. of the Sea Dragon?
  327.  
  328. Thanks.
  329.  
  330. --
  331. Thomas Clarke
  332. Institute for Simulation and Training, University of Central FL
  333. 12424 Research Parkway, Suite 300, Orlando, FL 32826
  334. (407)658-5030, FAX: (407)658-5059, clarke@acme.ucf.edu
  335.  
  336. ------------------------------
  337.  
  338. Date: Mon, 14 Dec 1992 16:54:44 GMT
  339. From: Nick Haines <nickh@CS.CMU.EDU>
  340. Subject: Space Tourism
  341. Newsgroups: sci.space
  342.  
  343. A bloke called (hmm, something like Drunken Loony, ah, I remember)
  344. Duncan Lunan did a presentation on space tourism (the economics and
  345. practicalities) at the Brighton Worldcon in 87. He had figures showing
  346. that at $1 million a head you could get at least $100 million for an
  347. orbital hotel (maybe it was $200m), without having to push the
  348. advertising too hard. If you can get the price down to $10000 you can
  349. get several $bn.
  350.  
  351. Think it was Duncan Lunan (from Imperial (?) College, London). Ask
  352. around on the .sf. groups, I bet there are others there who remember
  353. the talk.
  354.  
  355. Nick Haines nickh@cmu.edu
  356.  
  357. ------------------------------
  358.  
  359. Date: Mon, 14 Dec 92 09:14:44 -0800
  360. From: ganderson@force.decnet.lockheed.com
  361. Subject: SSF Progress
  362.  
  363. I have to comment on the dialog between Allan S. and L.W. on the relative
  364. progress of MacDonnell Douglas' WP-02.  I have missed some of the
  365. conversation but having read many of Alan's past missives and can't 
  366. surmize the general bent of his comments.  
  367.  
  368. First of all, I agree with the rebultal that the Space Station budget and
  369. design has been enything but stable.  NASA received "almost" full funding
  370. this year for the first time in about 4 years.  The pertinent point is 
  371. that "full" funding is determined AFTER NASA has squeezed their contractors
  372. to the wall as to schedule and budget.  So, ANY reduction in the proposed
  373. budget value will have some effect (there is no breathing room).  As an
  374. example, WP-04 was asked to quote (right after restructure) to a "Just
  375. in Time" building schedule.  To anyone who knows anything about designing
  376. and building a spacecraft, JIT principles do not mean anything except that
  377. you are accepting more schedule risk.  In the case of the Solar Arrays, of
  378. which I have very intimate knowledge, this has meant implementing a very
  379. cost ineffecient subcontractor delivery schedule of solar cells, bypass
  380. diodes, motor drive assemblies, etc.  It has also meant greater and greater
  381. schedule risk as the design process has been delayed by relatively minor
  382. glitches in the development test process as can be expected with any
  383. development program (but which Alan tends to ignore when he cites costs
  384. of developing new launch systems.)
  385.  
  386. Second, I would like to comment on the question of CDR design maturity.  It
  387. is true that it is a guideline that 90% of all drawings be complete by the 
  388. time of the CDR but, at least in the case of WP-04, there is nothing written
  389. into LMSC's subcontract requiring this value.  The 90% is an industry rule
  390. of thumb that must be tempered by two factors;  1)  Customer restraint in
  391. changing requirements and 2)  the relative number of structural vs. 
  392. mechanism drawings.  The second item is common sense.  You can sketch the
  393. cross-sections of major structural elements and describe their material
  394. make-up and most engineers and analysts can verify the strcture will do
  395. what is required (and of course, the fastening methods), however, 
  396. mechanisms must be scrutinized carefully for lubricants, surface finishes, 
  397. tolerances, meterial compatablity, etc.  Therefore, a mechanisms intense
  398. program will need to have a greater number of design drawings complete by
  399. CDR to "adequately disclose the design" as the phrase usually is place
  400. into contracts says.
  401.  
  402. Customer restraint in changing requirements is where NASA is falling down
  403. very heavily (the bigger they are, the harder they fall.)  It is not that
  404. NASA is changing their minds as to what they want, it is that NASA is just
  405. now getting together to find out whatthey require.  As an example, take
  406. plume loading on the Solar Arrays (again, a subject that I am very familiar
  407. with.)  The actual loads due to pluming were formally placed on out contract
  408. in January.....of 1992!!!  This is 3 years into the design process and
  409. after ALL the PDRs and some of the subcontract CDRs.  It is not that no
  410. one knew that plume loads were going to happen (we'd been screaming about
  411. not having a requirement for years) but it took that long for Mission Ops,
  412. (JSC) and Power Systems (NASA Lewis) to come up with numbers.  I have often
  413. heard the arguement that designers should have "put more margin" into the
  414. design to envelope this load case.  If you really want to be flamed, state
  415. that arguement....
  416.  
  417. Anyway, the bottom line is, when you are faced with multiple redesigns that
  418. effect most of the design drawings that are required, the number of 
  419. drawings that are "complete" at CDR can be compromised if the schedule of
  420. the CDR (and first element launch) is critical.  Again, it just assumes
  421. more risk to schedule when problems are discovered downstream of the
  422. CDR and after production has begun.
  423.  
  424. A final comment to my second point:  NASA has still not settled requirements. 
  425. At the Soalr Array Wing CDR which took place December 1-4, 1992, NASA Lewis
  426. and NASA JSC and Rocketdyne (WP-04 prime contractor) were still in disagree-
  427. ment over the plume loading and other shuttle induced loads on the array
  428. (docking, berthing, Asronaut induced truss oscillations...)  The "on
  429. contract" solution is to retract the arrays during all early mission (pre-
  430. permanently manned capability: PMC) shuttle docking proceedures.  NASA JSC is
  431. very much against this approach and I believe NASA REston is in agreement
  432. with them, for obvious reasons of practicality.  As of today, there are NO
  433. contractural requirements for dockingor bething loads on the solar arrays
  434. but there are studies going on about how to make the array mast withstand
  435. these loading scenarios.
  436.  
  437. My third and final point is about the integration of the station.  A very
  438. telling point was a converstation that accured during the Solar Array Wing
  439. CDR.  During discussions about what configuration the station is in
  440. during the second shuttle assembly flight, it was revealed that both
  441. arrays are deployed partially in what is called a "ready to deploy"
  442. configuration.  Unfortunately this is not how the thermal analysis
  443. was done as both Rocketdyne and LMSC had a different configuration in 
  444. which one array was fully stowed and the other in this "ready to deploy"
  445. configuration.  When asked by Rocketdyne how NASA intended to flow down
  446. this requirement to its contractors, NASA's response was that the new
  447. configuration was in the TOS (I later found out that this is a Technical
  448. Operation Support document).  Unfortunately the TOS is not on Rcoketdyne's
  449. contract.  When I enquired of JSC representatives as to who had 
  450. juresdiction over this TOS, he said that it was not an official document
  451. buut something that a few concerned JSC engineers put together because 
  452. they did not see the needed work being down as to the piece by piece
  453. analyssis of the on orbit configuration as the buildup progresses
  454. (remember, every element left up there has to act like a controllable
  455. spacecraft.)  So the bottom line is that their seems to be a very large
  456. lack of "big picture" work fromthe station system design standpoint.  If
  457. consolidating everything at JSC will fix this, then more power to it all.
  458.  
  459. Now that I have provided more fodder to Allan to call for the concellation
  460. of space Station, I might as well sign off.  Feel free to respond to
  461. my address below.
  462.  
  463. Grant Anderson
  464. Ganderson@jedi.decnet.lockheed.com
  465. Design Project Leader
  466. Space Station WP-04
  467. Lockheed Missiles and Space Co.
  468. Sunnyvale, CA
  469. All oppinions expressed are my own.  Facts speak for themselves.  Fools 
  470. speak for each other.  
  471.  
  472. ------------------------------
  473.  
  474. Date: 14 Dec 92 18:24:23 GMT
  475. From: "Allen W. Sherzer" <aws@iti.org>
  476. Subject: SSF Progress 1 of 2 (Was: One small step Space Activist)
  477. Newsgroups: sci.space
  478.  
  479. In article <n116bt@ofa123.fidonet.org> Wales.Larrison@ofa123.fidonet.org writes:
  480.  
  481. >>... Four years later, as a result of cost
  482. >>overruns, Work Package 02 now weighs in at $4.9 billion -- A 250%...
  483.  
  484. >   Hmm.... I'm not going to dispute these numbers, but there's a
  485. >distinct difference between "cost overruns" and "customer directed
  486. >changes".   
  487.  
  488. Not from my point of view. Most of this happened AFTER the redesign.
  489. Wether it is the result of NASA changing its mind or MD not up to the
  490. task we have a project out of control.
  491.  
  492. Either way we have a station which is taking longer and longer to build
  493. and costing more and more. The process being used simply doesn't work.
  494.  
  495. >Furthermore, a large chunk of these overrun costs seem
  496. >to be in General & Administrative cost categories (G&A), not in the
  497. >technical work performed.
  498.  
  499. So what?
  500.  
  501. >   Now, funding and design for the SSF has not been rock stable
  502. >either for the past 4 years.  I seem to remember at least 3 of the 4
  503. >budget requests being cut, funding restrictions placed on a couple,
  504. >and a major Congressional-directed redesign of the SSF.  
  505.  
  506. Cuts have been minor and shouldn't have resulted in these sort of
  507. increases and delays. Also, the redesign was well over two years
  508. ago. Plenty of time to produce a good schedule.
  509.  
  510. >   I'm not apologising for MD, but I would like to present some data
  511. >from the other side of the story.
  512.  
  513. Fair enough but I should point out that the SN article was not the
  514. only source I used. A source at NASA provided the rest.
  515.  
  516. >    What Allen didn't report, and what I see just as significant,
  517. >was that SN reported the NASA Inspector General had started a
  518. >separate audit to see if the restructuring of the Work Package 2
  519. >contract was done properly by NASA JSC.
  520.  
  521. Also, so what? This problem has been brewing for years. It looks like
  522. this audit only began when SN started looking around. Why the delay?
  523.  
  524. Also, the real problems aren't going to appear in any audit. The NASA
  525. auditor will consider $10,000 to deliver a pound to LEO a fair price.
  526. He won't blink at overhead rates which would give most CEO's a heart
  527. attack. He won't give a second thought to the effort and cost associated
  528. with a 1,000 page proposal when the equivaltnt commercial proposal would
  529. be 60 pages.
  530.  
  531. Auditors audit the process. When it is the process which doesn't work,
  532. they won't find it.
  533.  
  534. >>Worse yet, Work Package 02 is as much as 18 months behind schedule...
  535.  
  536. >   "The company informed NASA earlier this year that it could
  537. >    provide 700 drawings before a design review begins next year,
  538. >    but under NASA pressure agreed to provide 2700, NASA officials
  539. >    said.  Only 1100 are needed for the design review, according to
  540. >    Parkinson [The MD general manager for space station project
  541. >    control], so MD will exceed that target."
  542.  
  543. They provide 700 drawings where 1100 is the minimum and they agreed
  544. to 2700. How can that be said to exceed any target?
  545.  
  546. >    "Aaron [The space station program manager at JSC] said that some
  547. >     aspects of the work package are about a month behind, but
  548. >     denied there is any lag on the order of 18 months in his
  549. >     portion of the program. 
  550.  
  551. Sources have confirmed the 18 month behind schedule number. I stand by it.
  552. I believe their status on drawings (see above) also tends to confirm that
  553. they are a lot more than a month behind schedule.
  554.  
  555. >   In my opinion the real make or break for MD will be how MD
  556. >conducts itself at the work package 2 Critical Design Review (CDR)
  557. >this coming year.  
  558.  
  559. Except that under the JVIT system it will be much easier for the people
  560. responsible (JSC and MD) to cover up lack of progress since there will
  561. be no independent program office.
  562.  
  563.    Allen
  564.  
  565. -- 
  566. +---------------------------------------------------------------------------+
  567. | Allen W. Sherzer | "A great man is one who does nothing but leaves        |
  568. |  aws@iti.org     |  nothing undone"                                       |
  569. +----------------------131 DAYS TO FIRST FLIGHT OF DCX----------------------+
  570.  
  571. ------------------------------
  572.  
  573. Date: 14 Dec 92 18:28:20 GMT
  574. From: "Allen W. Sherzer" <aws@iti.org>
  575. Subject: Terminal Velocity of DCX? (was Re: Shuttle ...)
  576. Newsgroups: sci.space
  577.  
  578. In article <ewright.724353431@convex.convex.com> ewright@convex.com (Edward V. Wright) writes:
  579.  
  580. >Also note that the cost of one Shuttle flight is about the same
  581. >as the entire DC development program.
  582.  
  583. Not quite. It wold take about 1.5 years of Shuttle funding to develop DC. Now
  584. for the cost of a Shuttle flight, you could run a program to answer all the
  585. open technical questions and have enough left over to buy a Titan IV to
  586. launch the payload which would have gone up in the Shuttle.
  587.  
  588.   Allen
  589.  
  590. -- 
  591. +---------------------------------------------------------------------------+
  592. | Allen W. Sherzer | "A great man is one who does nothing but leaves        |
  593. |  aws@iti.org     |  nothing undone"                                       |
  594. +----------------------131 DAYS TO FIRST FLIGHT OF DCX----------------------+
  595.  
  596. ------------------------------
  597.  
  598. Date: 13 Dec 92 20:40:48 GMT
  599. From: Bruce Watson <wats@scicom.AlphaCDC.COM>
  600. Subject: Titan IV
  601. Newsgroups: sci.space
  602.  
  603. In article <71519@cup.portal.com| BrianT@cup.portal.com (Brian Stuart Thorn) writes:
  604. |
  605. |That was Number 6. I never heard anything about it, and was mildly
  606. |surprised to read about it in this weeks AVLeak and Space News. It
  607. |got no attention from the media (to the USAF's delight, no doubt), not
  608. |even with the last military shuttle mission launched a few days later.
  609.  
  610. It made our media. Denver Post: _Titan IV Carries Secret Payload Into
  611. Space_, Vandeberg AFB, CA -- At Titan IV rocket carrying a secret
  612. government payload was launched yesterday from this central coast
  613. base, officials said...etc.
  614.  
  615. -- 
  616. Bruce Watson (wats@scicom) Bulletin 629-49 Item 6700 Extract 75,131
  617.  
  618. ------------------------------
  619.  
  620. Date: 14 Dec 92 13:53:14 GMT
  621. From: "Allen W. Sherzer" <aws@ITI.ORG>
  622. Subject: Titan IV Costs
  623. Newsgroups: sci.space
  624.  
  625. In article <n116at@ofa123.fidonet.org> Wales.Larrison@ofa123.fidonet.org writes:
  626.  
  627. >...
  628. >    Titan IV                      $ 360 M (w/ Centaur upper stage)
  629. >    Titan IV                      $ 315 M (no upper stage)
  630.  
  631. Interesting number. We have two government developed launchers (Shuttle and
  632. Titan IV) and both cost about $8,000 to $10,000 to put a pound into LEO.
  633.  
  634. Yet commercial providers only cost half to a third of that even though they
  635. only launch smaller payloads and don't get advantages of economy of scale. Even
  636. the now defunct Titan III (same basic design and even made on the same
  637. production line as Titan IV) costs less than half the Titan IV.
  638.  
  639. Supporters of NLS and Spacelift I take note.
  640.  
  641.   Allen
  642.  
  643. -- 
  644. +---------------------------------------------------------------------------+
  645. | Allen W. Sherzer | "A great man is one who does nothing but leaves        |
  646. |  aws@iti.org     |  nothing undone"                                       |
  647. +----------------------131 DAYS TO FIRST FLIGHT OF DCX----------------------+
  648.  
  649. ------------------------------
  650.  
  651. Date: 14 Dec 92 15:02:05 GMT
  652. From: Gary Coffman <ke4zv!gary>
  653. Subject: Titan IV Costs
  654. Newsgroups: sci.space
  655.  
  656. In article <n116at@ofa123.fidonet.org> Wales.Larrison@ofa123.fidonet.org writes:
  657. >  
  658. >    Titan IV                      $ 360 M (w/ Centaur upper stage)
  659. >    Titan IV                      $ 315 M (no upper stage)
  660.  
  661. Do these costs include support costs at Vandenburg and Canaveral? Or
  662. are they just purchase costs?
  663.  
  664. Gary
  665.  
  666. ------------------------------
  667.  
  668. Date: 14 Dec 92 14:25:57 GMT
  669. From: Dave Rogers <dave@rsd.dl.nec.com>
  670. Subject: What is a VSAT?
  671. Newsgroups: sci.space,sci.astro
  672.  
  673. In article <1992Dec11.175249.21479@athena.mit.edu>, mock@space.mit.edu (Patrick C. Mock) writes:
  674. |> 
  675. |> Does anyone know what does VSAT (Very Small Aperature Terminal) mean 
  676. |> in the context of satellite communications?
  677. |> 
  678.  
  679. A VSAT is a C-band system which provides one-way, two-way and broadcast
  680. capabilities for audio, video and data.  Data rates up to DS-1 (1.5 M
  681. bits per second) are available.  Dishes are typically 1-3 meters in
  682. diameter.  Complete systems (one-end) sell for $6-15K.  You must lease
  683. time on a transponder from one of the many companies which do this (AT&T
  684. Spacenet, GTE Skynet, Comstream, Vitacom). 
  685.  
  686.  
  687. ===============================================================================
  688. Dave Rogers                                           
  689. M & R Software, Inc.
  690. Internet:   dave@rsd.dl.nec.com
  691. On contract to: NEC America, Radio Software Dept
  692.  
  693. Don't take life too seriously; you're not going to get out of it alive anyway.
  694.  
  695. ------------------------------
  696.  
  697. Date: 14 Dec 92 02:59:45 GMT
  698. From: Matthew Thomas DeLuca <matthew@oit.gatech.edu>
  699. Subject: what the little bird told Henry
  700. Newsgroups: sci.space
  701.  
  702. In article <1gasfqINNkpa@transfer.stratus.com> dswartz@redondo.sw.stratus.com (Dan Swartzendruber) writes:
  703.  
  704. >Look, it's pretty clear (at least to me, and going by some other recent
  705. >postings, to other people as well) that Gary has some kind of axe to
  706. >grind against the whole SSTO concept.
  707.  
  708. I don't agree with many of the statements that Gary has made about the SSTO
  709. program, but it's refreshing to see someone who *doesn't* believe this will 
  710. automatically be the salvation of the space program.  
  711. -- 
  712. Matthew Thomas DeLuca
  713. Georgia Institute of Technology, Atlanta Georgia, 30332
  714. uucp:      ...!{decvax,hplabs,ncar,purdue,rutgers}!gatech!prism!matthew
  715. Internet: matthew@prism.gatech.edu
  716.  
  717. ------------------------------
  718.  
  719. Date: 14 Dec 92 13:44:23 GMT
  720. From: Gary Coffman <ke4zv!gary>
  721. Subject: what the little bird told Henry
  722. Newsgroups: sci.space
  723.  
  724. In article <1gasfqINNkpa@transfer.stratus.com> dswartz@redondo.sw.stratus.com (Dan Swartzendruber) writes:
  725. >
  726. >Look, it's pretty clear (at least to me, and going by some other recent
  727. >postings, to other people as well) that Gary has some kind of axe to
  728. >grind against the whole SSTO concept.
  729.  
  730. No, I don't have an axe to grind against the SSTO *concept*, or even
  731. against the DCX test program. What I do have an axe to grind about is
  732. people who say, "DC-1 is the answer. Now what was the question?"
  733.  
  734. Gary
  735.  